Feb 20 2013

The Grand Victorian Tour – Before Demolition

May 1 2013

Removing the Back Screened in Porch

May 30 2013

New Siding is HERE! Victorian Exterior in Effect!

Jul 1 2013

Rebuilding the Kitchen

May 31 2013

Kitchen Demolition – Victorian Chimney Removal Part 2

Jun 1 2013

Side Porch Redo – Victorian Post Included

Primary Menu
  • The Owners
  • The Tours

Author: Mike

  • Home
  • Mike
Category:
  • Tour

Before We Even Bought Our House

Found some pics on my computer I took while we were touring the house before we bought it. Quite a few changes!

Posted On : August 8, 2018 Published By : Mike
Category:
  • Finished Work

Making a Brand New Kitchen

Now that we had our new floor put down in the kitchen it was time to turn it into an actual kitchen using Ikea cabinets. As much as I love Continue Reading

Posted On : June 19, 2018 Published By : Mike
Category:
  • Finished Work

Master Bathroom Complete With Clawfoot Tub

Since the tile was also finished upstairs we were able to start on the master bathroom. Step one was to put in the medicine cabinet that had been floating around Continue Reading

Posted On : November 29, 2017 Published By : Mike
Category:
  • Finished Work

Completing the Half Bathroom and Wainscoting

From where we left off from the Tile Installation we’ve now got a perfectly good half bathroom ready to be finished. Step one was to install the base molding. Followed Continue Reading

Posted On : November 29, 2017 Published By : Mike
Category:
  • Rebuilding

Tile Floors for Kitchen, Half Bath, Bathroom, Laundry Room

For the flooring in any area with the potential for water we opted for wood look tile instead of actual hardwood. I wanted a ceramic since I liked the texture Continue Reading

Posted On : November 29, 2017 Published By : Mike
Sheetrock
Category:
  • Rebuilding

Sheetrock is Up!

Putting up the sheetrock was a long, arduous process. The framing was uneven, the floor wasn’t level, the ceiling looked like a sine wave. But with enough perseverance, and shims, Continue Reading

Posted On : February 4, 2016 Published By : Mike
Category:
  • Finished Work

Ready for Sheetrock! The Construction Tour

After what feels like years (because it was) of demolition, reconstruction, and prep work, we’re finally ready to put sheetrock back up in the house. This is the cleanest it Continue Reading

Posted On : December 20, 2015 Published By : Mike
Category:
  • Finished Work

Installing a Wall Mounted Bathroom Vent

So we’ve converted the pantry into a half-bathroom as outlined in my previous post. The problem now is that there’s no window in the room and the ceiling is vaulted Continue Reading

Posted On : November 30, 2015 Published By : Mike
Category:
  • Rebuilding

New Attic Steps for Victorian Walkup Attic

Though no one’s fault in particular (it was definitely me) the first few steps going up to the walkup attic were broken and currently being held up with some makeshift Continue Reading

Posted On : November 3, 2015 Published By : Mike
Category:
  • Finished Work

The Plumbing: Bathroom, Laundry Room, Half-Bathroom, Kitchen

The bathroom when we first got the house was incredibly narrow and we had a hard time figuring out how to make it better. After much discussion we decided that Continue Reading

Posted On : August 13, 2015 Published By : Mike

Posts navigation

Older posts

Categories

  • Before and After (4)
  • Demolition (14)
  • Finished Work (14)
  • Rebuilding (20)
  • Tour (5)
  • Yardwork (3)

Support Our Progress

Please CLICK HERE and buy something from Amazon

Recent Posts

  • Before We Even Bought Our House
  • Making a Brand New Kitchen
  • Master Bathroom Complete With Clawfoot Tub
  • Completing the Half Bathroom and Wainscoting
  • Tile Floors for Kitchen, Half Bath, Bathroom, Laundry Room

Archives

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Copyright All rights reserved