Category: Finished Work

Making a Brand New Kitchen

Now that we had our new floor put down in the kitchen it was time…

 Posted in Finished Work

Master Bathroom Complete With Clawfoot Tub

Since the tile was also finished upstairs we were able to start on the master…

 Posted in Finished Work

Completing the Half Bathroom and Wainscoting

From where we left off from the Tile Installation we’ve now got a perfectly good…

 Posted in Finished Work

Ready for Sheetrock! The Construction Tour

After what feels like years (because it was) of demolition, reconstruction, and prep work, we’re…

 Posted in Finished Work

Installing a Wall Mounted Bathroom Vent

So we’ve converted the pantry into a half-bathroom as outlined in my previous post. The…

 Posted in Finished Work

The Plumbing: Bathroom, Laundry Room, Half-Bathroom, Kitchen

The bathroom when we first got the house was incredibly narrow and we had a…

 Posted in Finished Work

Replacing the Main Conduit

The guys I hired to do the gutters mistakenly put the gutter behind the conduit…

 Posted in Finished Work

HVAC System and Gas Piping – Victorian Retrofit

Prior to our purchase and the last hundred twenty some-odd years this Victorian has been…

 Posted in Finished Work

Resurfacing the Fireplace

So the fireplace in the dining room, as it stood, was just ugly. It was…

 Posted in Finished Work

Finishing the Back with Victorian Style Railing

Since I was tired of worrying about people tripping out the back door and going…

 Posted in Finished Work